Sustainable Play Grounds
Founder Mike Dieterich developed the policies for sustainable playgrounds in DC. This later evolved into the scope of work for […]
Founder Mike Dieterich developed the policies for sustainable playgrounds in DC. This later evolved into the scope of work for […]
January 2012 Upgrading twenty seven (27) school buildings and six recreation centers, a breadth of scope in water conservation and
February 2012 – October 2014 “Greenest” School in the World. Received the highest distinction, by the U.S. Green Building Council (USGBC) certified
October 2012 – October 2013 Sustainability efforts paved the way for the first LEED CI platinum building in DCPS history.
April 2013 – October 2013 Advancing sustainability incentives utilizing hard data juxtaposed with design guidelines and effective commissioning. The ORC evaluates seven
twenty one (21) of forty seven (47) projects, are currently LEED certified.Of those certified projects, two are LEED Platinum
November 2007 – August 2010 Managed 30 people including 7, 3 man crews across the US and it’s territories. This project was
September 2010 – January 2012 This project required, project engineering, scheduling, purchasing, construction supervision and safety oversight, commissioning and closeout. Delivery of
August 2010 – January 2012 This project required, project engineering, scheduling, purchasing, construction supervision and safety oversight, commissioning and closeout. Delivery of
August 2010 – August 2011 This project included a lighting upgraded, Building systems controls, HVAC, AHU upgrades, and installation of low flow